Kartal-Kaynarca Subway Line
Istanbul/TURKEY
2016
250.000 m2
SOAJV
SCOPE OF WORK |
||
|
34.5 kV Switchboard System |
||
|
34.5 kV/0.4 kV Auxiliary Service Transformer |
||
|
Rectifier-Transformer / Rectifier System |
||
|
Earthing and Bonding System |
||
|
UPS, Battery and Battery Charging Equipments |
||
|
Stray Current and Corrosion Monitoring System |
||
|
Low Current and Low Voltage Distribution Cables |
||
|
Overhead Conductor Rail System OCRS |
||
|
34.5 kV Underground Power Cable |
||
|
Busbar Power Distribution Systems |
||
|
0.4 kV AG Main Distribution Panels |
||
|
Earthing System Supply and Installation |
||
|
Tunnels and Stations Signalling System Cabling and Device Installation |
||
|
MCC Panels Supply and Installation |
||
|
Control and Communication System Design |
||
|
Transmission System |
||
|
Phone System, Radio System |
||
|
Radio System Leaky Cable Supply and Installation |
||
|
Audio & Public Address System, CCTV System, Synchronized Clock |
||
|
Access Control System |
||
|
Supervisory Control and Data Acquisition (SCADA) Environmental |
||
|
System Station Information Management System(ECS/SIMS) |
||
|
Fire Detection and Alarm System |
||
|
Low Voltage System and Lighting System |
||
|
Running Tunnels Low Voltage System and Lighting System |